Case Studies

Tubulars Case Studies

Liberty Care Home - Van Elle

In 2022, we supported our long-standing client, Van Elle, with the supply of steel tubulars for piling for the building of a 72-bedroom, 3-storey care home inStoke-On-Trent, Staffordshire.

View Case Study

Ground Source Heating Scheme - WB + AD Morgan

Supply of steel casing for the installation of an open loop ground source heating scheme.

View Case Study

Baytree Nuneaton – Balfour Beatty Ground Engineering

Balfour Beatty Ground Engineering was contracted by Glencar Construction Ltd for the piling work at their Baytree Nuneaton project site in Warwickshire. 

View Case Study

Kexby Old Bridge Stabilisation - Ivor King

Ivor King, one of the UK’s leading sheet piling and bored piling contractors, was contracted to install piling to assist with the structural stability of a Grade II listed bridge near York which dated back to 1650.

View Case Study

Waterfront Plaza - Roger Bullivant Limited 

Roger Bullivant Limited (RB) was employed to install tubular steel piles required to support a new housing development at Waterfront Plaza, Leith, Edinburgh on behalf of Cala Homes (East) Scotland and Port of Leith Housing Association. 

View Case Study

Redbridge Park - Akela Ground Engineering  

Akela Ground Engineering was contracted by ACS Construction for the piling work at Redbridge Park & Ride charging hub on behalf of Dutch company Fastned. 

View Case Study

Brent Crossing - Van Elle

For this project John Lawrie Tubulars supplied 1,843 meters of 457and 339mm pipe to be used as piling for the foundations of the slow line platform at Brent Cross West Station.

View Case Study

Don Valley Viaduct - Van Elle

Our client Van Elle won the work to install piles that would form part of a new shock absorber anchorage system that would allow the Don Valley Viaduct to remain in use for many years.

View Case Study

Broom Close Embankment - Story Contracting Ltd

For this bank stabilisation project, we supplied 117 No. 339mm diameter Grade L80 steel Circular Hollow Section (CHS) piles which were cut to length and supplied from our Montrose facility.

View Case Study

Grangemouth / BBGE - Balfour Beattie

The project, situated in Grangemouth, Scotland involves installing around 260 No. 508mm diameter steel
tube piles to support varying structures as part of the new Energy from Waste centre.

View Case Study

Montrose Port Authority - Montrose Port

We supported piling phases one and two on a multimillion pound redevelopment project at Montrose Port.

View Case Study

The Event Complex Aberdeen - P&J Live Building

The P&J Live Arena, Aberdeen’s state-of-the-art conference, exhibition and entertainment complex
opened in 2019, boasts foundations made from oil and gas pipe and casing which have been repurposed and reused into piling posts.

View Case Study